Sunday, September 14, 2008
Sunday, May 4, 2008
Pretty much done
Saturday, April 19, 2008
Kitchen kabinets in
Ok, here are the updates since last time. Smoke detectors, ceiling fans, thermostat and airconditioning has been installed, walls painted, baseboards, kitchen cabinets, counters, kitchen tiling, bathroom floors, vanities, light fixtures and the steps to the back lawn. + some other stuff. The carpeting will be installed very soon as well.
Here are some kitchen photos.




Here are some kitchen photos.
Tuesday, March 25, 2008
Drywall and insulation
Last week before we left to go to the farm, the builder had put up the gutters. They are barely noticeable. When we came back on Sunday the insulation was in the wall and today almost the entire house has drywall. Only some parts of the garage still has drywall in it.
Here are some photos of the walls in the kitchen and the entrance area as well as the outside where you can see tthe gutters.



Here are some photos of the walls in the kitchen and the entrance area as well as the outside where you can see tthe gutters.



Wednesday, March 12, 2008
All siding up and door locked
Siding is now on all sides, plumbing has been installed along with air vents etc.
The gutters will probably be attached in a week or so. No idea when the screendoor and railing will be installed. As of current we have been informed that the electric wiring is being installed so we will come back and check later this week. Here are some new photos.
View from stairway into living room

The gutters will probably be attached in a week or so. No idea when the screendoor and railing will be installed. As of current we have been informed that the electric wiring is being installed so we will come back and check later this week. Here are some new photos.
This is the radon detection air vent.
View from stairway into living room
Monday, March 10, 2008
Shingles and siding
We have been gone for the week-end and haven't checked the house since Thursday. The roof now has shingles (which is comforting considering the changing weather conditions recently) and the siding was still being put up as we visited today. We expect to go back again in a day or two, but don't expect too big outside cosmetic changes now that the siding is up. The plumbing is also being installed as we speak.