The gutters will probably be attached in a week or so. No idea when the screendoor and railing will be installed. As of current we have been informed that the electric wiring is being installed so we will come back and check later this week. Here are some new photos.
This is the radon detection air vent.
View from stairway into living room

No comments:
Post a Comment